← Knowledge Centre
Section 07.2 · EN
Section 07.2 · EN
Capability Statement · BETA Projects
Category · EN
Engineering
Technical reference on the material, environmental and structural conditions that govern how a floor performs once installed. Written for design and construction teams.
Entries
5 Reference Entries
- 07.2.01
Moisture movement
How hygroscopic materials respond to ambient humidity, and the tolerances designed to accommodate that movement.
4 Min ReadRead → - 07.2.02
Expansion gaps
Sizing perimeter and intermediate gaps against species, format and floor area.
3 Min ReadRead → - 07.2.03
Subfloors
The substrate types encountered in commercial construction and the performance requirements each imposes.
4 Min ReadRead → - 07.2.04
Substrate preparation
Grinding, patching and priming — the pre-installation work that determines long-term performance.
4 Min ReadRead → - 07.2.05
Acclimatisation
Conditioning product to the service environment before installation.
3 Min ReadRead →
Adjacent Categories
Continue in the Reference Library
Engagement
Open a procurement conversation on an upcoming project.
Enquiries are read against project fit, category and programme prior to engagement.