Factories run to a production schedule allocated weeks or months in advance. An order does not enter production the moment it is placed; it is allocated to a slot in the existing schedule.

Standard-range product typically holds shorter allocation windows because it fits alongside existing runs. Custom colour, dimension or specification requires a dedicated production slot, which is scheduled against the factory's committed capacity.

The practical implication is that lead time is set at order release, not at enquiry. The window is confirmed against the schedule the factory is actually running, not against a generic quotation. A disciplined supply reports the allocated production date at acknowledgement so the programme can be planned against a confirmed window.

End of entry
07.7.01 · BETA Projects
About the author
BP
BETA Projects · Technical Desk
Written and held current by the BETA Projects reference team.

Reference entries in the Knowledge Centre are authored by the BETA Projects procurement and technical desk — the same operators who qualify factories, run inspections and manage commercial supply for commercial builders and developers. Content is reviewed against active project experience and updated as manufacturing practice moves.

Editorial · Technical Desk
Review · Procurement Lead
Held Current · 2026
Engagement

Open a procurement conversation on an upcoming project.

Enquiries are read against project fit, category and programme prior to engagement.